You are currently browsing the tag archive for the ‘Disruption’ tag.

Life goes on, and I hope you are all staying safe while thinking about the future. Interesting in the context of the future, there was a recent post from Lionel Grealou with the title: Towards PLM 4.0: Hyperconnected Asset Performance Management Framework.

Lionel gave a kind of evolutionary path for PLM. The path from PLM 1.0 (PDM) ending in a PLM 4.0 definition.  Read the article or click on the image to see an enlarged version to understand the logical order. Interesting to mention that PLM 4.0 is the end target, for sure there is a wishful mind-mapping with Industry 4.0.

When seeing this diagram, it reminded me of Marc Halpern’s diagram that he presented during the PDT 2015 conference. Without much fantasy, you can map your company to one of the given stages and understand what the logical next step would be. To map Lionel’s model with Marc’s model, I would state PLM 4.0 aligns with Marc’s column Collaborating.

In the discussion related to Lionel’s post, I stated two points. First, an observation that most of the companies that I know remain in PLM 1.0 or 2.0, or in Marc’s diagram, they are still trying to reach the level of Integrating.

Why is it so difficult to move to the next stage?

Oleg Shilovitsky, in a reaction to Lionel’s post, confirmed this. In Why did manufacturing stuck in PLM 1.0 and PLM 2.0? Oleg points to several integration challenges, functional and technical. His take is that new technologies might be the answer to move to PLM 3.0, as you can read from his conclusion.

What is my conclusion?

There are many promising technologies, but integration is remaining the biggest problem for manufacturing companies in adopting PLM 3.0. The companies are struggling to expand upstream and downstream. Existing vendors are careful about the changes. At the same time, very few alternatives can be seen around. Cloud structure, new data management, and cloud infrastructure can simplify many integration challenges and unlock PLM 3.0 for future business upstream and especially downstream. Just my thoughts…

Completely disconnected from Lionel’s post,  Angad Sorte from Plural Nordic AS wrote a LinkedIn post: Why PLM does not get attention from your CEO. Click on the image to see an enlarged version, that also neatly aligns with Industry 4.0. Coincidence, or do great minds think alike? Phil Collins would sing: It is in the air tonight

Angad’s post is about the historical framing of PLM as a system, an engineering tool versus a business strategy. Angrad believes once you have a clear definition, it will be easier to explain the next steps for the business. The challenge here is: Do we need, or do we have a clear definition of PLM? It is a topic that I do not want to discuss anymore due to a variety of opinions and interpretations.  An exact definition will never lead to a CEO stating, “Now I know why we need PLM.”

I believe there are enough business proof points WHY companies require a PLM-infrastructure as part of a profitable business. Depending on the organization, it might be just a collection of tools, and people do the work. Perhaps this is the practice in small enterprises?

In larger enterprises, the go-to-market strategy, the information needs, and related processes will drive the justification for PLM. But always in the context of a business transformation. Strategic consultancy firms are excellent in providing strategic roadmaps for their customers, indicating the need for a PLM-infrastructure as part of that.

Most of the time, they do not dive more in-depth as when it comes to implementation, other resources are needed.

What needs to be done in PLM 1.0 to 4.0 per level/stage is well described in all the diagrams on a high-level. The WHAT-domain is the domain of the PLM-vendors and implementers. They know what their tools and skillsets can do, and they will help the customer to implement such an environment.

The big illusion of all the evolutionary diagrams is that it gives a false impression of evolution.  Moving to the next level is not just switching on new or more technology and involve more people.

So the big question is HOW and WHEN to make progress.

HOW to make progress

In the past four years, I have learned that digital transformation in the domain of PLM is NOT an evolution. It is disruptive as the whole foundation for PLM changes. If you zoom in on the picture on the left, you will see the data model on the left, and the data model on the right is entirely different.

On the left side of the chasm, we have a coordinated environment based on data-structures (items, folders, tasks) to link documents.

On the right side of the chasm, we have a connected environment based on federated data elements and models (3D, Logical, and Simulation models).

I have been discussing this topic in the past two years at various PLM conferences and a year ago in my blog: The Challenges of a connected ecosystem for PLM

If you are interested in learning more about this topic, register for the upcoming virtual PLM Innovation Forum organized by TECHNIA. Registration is for free, and you will be able to watch the presentation, either live or recorded for 30 days.

At this moment, the detailed agenda has not been published, and I will update the link once the session is visible.  My presentation will not only focus on the HOW to execute a digital transformation, including PLM can be done, but also explain why NOW is the moment.

NOW to make progress

When the COVID19-related lockdown started, must of us thought that after the lockdown, we will be back in business as soon as possible. Now understanding the impact of the virus on our society, it is clear that we need to re-invent ourselves for a sustainable future, be more resilient.

It is now time to act and think differently as due to the lockdown, most of us have time to think.  Are you and your company looking forward to creating a better future? Or will you and your company try to do the same non-sustainable rat race of the past and being caught by the next crises.

McKinsey has been publishing several articles related to the impact of COVID19 and the article: Beyond coronavirus: The path to the next normal very insightful

As McKinsey never talks about PLM, therefore I want to guide you to think about more sustainable business.

Use a modern PLM-infrastructure, practices, and tools to remain competitive, meanwhile creating new or additional business models. Realizing concepts as digital twins, AR/VR-based business models require an internal transition in your company, the jump from coordinated to connected. Therefore, start investigating, experimenting in these new ways of working, and learn fast. This is why we created the PLM Green Alliance as a platform to share and discuss.

If you believe there is no need to be fast, I recommend you watch Rebecka Carlsson’s presentation at the PLMIF event. The title of her presentation: Exponential Tech in Sustainability. Rebecca will share insights for business development about how companies can upgrade to new business models based on the new opportunities that come with sustainability and exponential tech.

The reason I recommend her presentation because she addresses the aspect of exponential thinking nicely. Rebecka states we are “programmed” to think local-linear as mankind. Exponential thinking goes beyond our experience. Something we are not used doing until with the COVID19-virus we discovered exponential growth of the number of infections.

Finally, and this I read this morning, Jan Bosch wrote an interesting post: Why Agile Matters, talking about the fact that during the design and delivery of the product to the market, the environment and therefore the requirements might change. Read his post, unless as Jan states:

Concluding, if you’re able to perfectly predict the optimal set of requirements for a system or product years ahead of the start of production or deployment and if you’re able to accurately predict the effect of each requirement on the user, the customer and the quality attributes of the system, then you don’t need Agile.

What I like about Jan’s post is the fact that we should anticipate changing requirements. This statement combined with Rebecka’s call for being ready for exponential change, with an emerging need for sustainability, might help you discuss in your company how a modern New Product Introduction process might look like, including requirements for a sustainable future that might come in later (per current situation) or can become a practice for the future

Conclusion

Now is the disruptive moment to break with the old ways of working.  Develop plans for the new Beyond-COVID19-society.  Force yourselves to work in more sustainable modes (digital/virtual), develop sustainable products or services (a circular economy), and keep on learning. Perhaps we will meet virtually during the upcoming PLM Innovation Forum?

Note: You have reached the end of this post, which means you took the time to read it all. Now if you LIKE or DISLIKE the content, share it in a comment. Digital communication is the future. Just chasing for Likes is a skin-deep society. We need arguments.
Looking forward to your feedback.

The past weeks I have discussed at various events two topics that appeared to be different:

  • The change from an analogue, document-driven enterprise towards a digital, data-driven enterprise with all its effects. E.g. see From a linear world to fast and circular?
  • The change in generations upcoming. The behavior and the attitude of the analogue generation(s) and the difference in behavior from the digital generation(s).

During PDT2015 (a review of the conference here), we discussed all the visible trends that business in exponential changing in some industries due to digitalization and every cheaper technology. The question not answered during that conference was: How are we going to make this happen in your company?

HOW ?

Last week I spoke at a PLM forum in Athens and shared with the audience the opportunities for Greece to catch-up and become a digital service economy like Singapore. Here I pictured an idealistic path how this could happen (based on an ideal world where people think long-term).

A mission impossible, perhaps.

clip_image002

The primary challenge to move from analogue towards digital is to my opinion the difference in behavior of the analogue and digital generations (and I am generalizing of course)

The analogue generation has been educated that knowledge is power. Store all you know in your head or keep it in books close to you. Your job was depending on people needing you. Those who migrated to the digital world most of the time continued the same behavior. Keep information on your hard disk or mailbox. A job was designed for life and do not plan to share as your job might come at risk. Continuous education was not part of their work pattern. And it is this generation that is in power in most of the traditional businesses.

clip_image004

The digital generation has been educated (I hope so – not sure for every country) to gather information, digest and process it and come with a result. There is no need to store information in your head as there is already an information overflow. Store in your head methodology and practices to find and interpret data. The digital generation for sure wants a stable work environment but they already grew up with the mindset that there is no job for life, having seen several crises. It is all about being flexible and keep your skills up-to-date.

So we have the dilemma here that business is moving from analogue towards digital, where the analogue business represents the linear processes that the old generation was used to. Digital business is much more an iterative approach, acting and adapting on what happens around you. A perfect match for the digital generations.

A dilemma ?

Currently the old generation is leading and they will not easy step aside due to their classical education and behavior. We cannot expect behavior to change, just because it is logically explained. In that case, everyone would stop smoking or adopt other healthy standards.

clip_image006The dilemma reminded me of the Innovators Dilemma, a famous theory from Clayton Christensen, which also could apply to analogue and digital businesses. Read more about the Innovators Dilemma here in one of my older blog posts: The Innovator´s dilemma and PLM. You can replace the incumbent with the old analogue generation and the disruptive innovation comes from using digital platforms and information understood by the digital generation. If you follow this theory, it would mean old businesses would disappear and new businesses would pop-up and overtake the old companies. Interesting conclusion, however, will there be disruption everywhere?

Recently I saw Peter Sondergaard from Gartner presenting at Gartner Symposium/ITxpo 2015 in Orlando. In his keynote speech, he talked about the value of algorithms introducing first how companies should move from their traditional analogue business towards digital business in a bimodal approach. Have a read of the press release here.

If you have the chance to view his slick and impressive keynote video (approx. 30 minutes) you will understand it better. Great presentation. In the beginning Peter talks about the bimodal approach sustaining old, slowly dying analogue businesses and meanwhile building teams developing a digital business approach. The graph below says it all.

clip_image008

Interesting from this approach is that a company can evolve without being disrupted. Still my main question remains: Who will lead this change from the old analogue business towards modern digital business approach. Will it be the old generation coaching the new generation or will there be a natural evolution at the board level required before this process starts?

HOW ?

I have no conclusion this time as I am curious to your opinion. A shift in business is imminent, but HOW will companies / countries pick-up this shift?

Your thoughts or experiences ?

statisticsDo you know the expression: “You have lies, damned lies and statistics”? Pointing to the fact that statistics are often abused to “prove” statements. A typical example from Hans Rosling, the Swedish statistics guru and entertainer: “In Sweden most of the people have an above average amount of legs!”

The proof: the Swedish average is 1.999 and as most of the people in Sweden have 2 legs, thus above average. Now it is time to share some statistics with you.

Last time, I asked readers of this blog to participate in a small survey about their PLM thoughts and experiences. Although many people have read the post, perhaps, not till the end, there are only 22 responses so far at this time. If you haven’t participated yet, please do so by answering: 6 questions – the result will be published in July. There are no rewards to win. The only thing we all will gain is the statistical insight of people who have read this blog and apparently are PLM minded.

What does it mean to be PLM-minded?

There are many discussions related to PLM. What is actually PLM? Is it A Journey ? Or is it a Vision? An IT-solution? An infrastructure? Or is it Boring or just the Opposite?

roiIt is hard to tell what the purpose is of PLM really without some numbers to guide you. And when it comes to PLM decisions, I noticed that most of the companies, I am working with, believe they make decisions based on numbers and statistics. Personally I believe in our current society it is more the emotional side that drives our decisions, not pure the rational and numbers. This is another discussion.

We always find a way to interpret the numbers. For the outside world, we pretend we make decisions based on pure, objective criteria. This would mean you can capture an organization in numbers and decide from there what’s best for the organization. An utopia we will see after some small statistics.

Some numbers

In the past year I spent most of my time in eight PLM-related discussions, most of them still on-going. Here, some of the statistics

Size

imageFour of them are large enterprises, where the power is inside the business unit. They act as one company, (one logo) but actually every business unit is focused on their own business profit and loss. They are not genuinely motivated to think about synergy with other businesses in cases it affects their work. Sometime IT believes they can bring the synergy by defining the common tools.

The other four companies are more centralized enterprises; some of them are large, with a centralized management and a single target to deliver to the market. Therefore, for a PLM project, they are easier to work with as you have more a single voice, instead of an opinion with a lot of conditions.

Type

All eight companies are not in traditional PLM industries. They are either project centric industries, where every delivery is supposed to be unique, or they are an owner/operator of a collection of assets to be managed during a long lifecycle. The reason: since 2008 I am personally interested and driven to demonstrate PLM practices and capabilities are valid for other industries too.

All eight companies involved expressed in the current engagement that PLM is essential for their future.

Vision

visionThe need for PLM comes from a vision. I believe you should start always with the vision. Before acting, you need to know what your goal is. And a goal does not mean you know what your pain is. Understanding the pains does not solve the future; it is a first step to help you shape a future with no more pains. A typical example that they are different can be found in the current economic crisis. Everyone experiences the pains and understands there is a need for change. But all we have a different opinion about that is the required change. There is no single vision?

From the eight companies, only two of them could express a clear vision where they want to be in the future. This means six of them either have not clarified their vision yet (still in work) or even do not believe there is a way to define the vision. They are more focused on solving a pain than creating a vision.

Game changer

imageIn three companies, the PLM project is considered to be a game changer. It was not about just fixing actual pains. The target is to be different from the competition and achieve a competitive advantage. Game changers are the most complex projects. The company needs to have a clear vision. It needs to have a trust in the fact that changing the game is indeed possible. And finally game changing contains the word CHANGE, which most companies try to avoid (evolution no revolution). But game changers, when successful, have the dominant companies for several years before others catch up.

NoChangeIn relation to change, two of the eight companies believe will be impossible to change the game. Although individual persons in the organization believe it is required, their ERP implementation and its related implementation scope have already taken part of the logical PLM space. This is blocking any serious PLM initiative making the implementation a PDM implementation, which has less value.

Constraints

Four companies stated upfront IT-constraints that could not be discussed. This introduced a lot of complexity. Some of the IT-constraints were emotional (we just decided a year ago to standardize on software xyz – we cannot afford to change to something else now, perhaps in the future). Other constraints were quite irrational and were based on (IT) decisions to standardize on a technology or solution, irrelevant or counterproductive to the business needs.

ROI

Only three of the eight companies require an ROI estimate to convince the management. As mentioned before, everyone is looking for reliable numbers to support a decision. Still decisions are made emotionally, and ROI numbers might be based on statistics. These three companies believe that the ROI numbers will lead to the right decision.

No_roiAnother three out of this eight companies did not need an ROI estimate. They think that what they will select as future solution is always justified: they just need PLM. The difficulty will come when they have to compare RFPs (Request for Proposal) from different vendors. Each vendor is focusing on its unique features, and from there the RFP review becomes an apples and pears comparison. Probably again the emotional decision will be made at the end. Most likely the cheapest to be sure nobody can be blamed.

PLM = PLM?

I believe the small amount of statistics provided in this post demonstrate that it is not easy to get a hundred percent common understanding of what PLM is about. Imagine what you would give as advice to one of these eight companies. This makes PLM difficult as a discipline as it is not just a collection of tools to implement. If you are selling hammers everything might look like a nail. Be aware of hammer PLM.

picongressIn addition to what is PLM, the majority of companies that claim to have implemented a PLM system do not necessary use PLM in all its capabilities. Often it is still more automation of the way the company worked before. Something you understand when attending PLM user conferences, like the product innovation conferences.

Innovation and disruption needed

I believe that in order to benefit in an optimal manner from PLM, a company needs to switch their mindset from being a departmental measured and triggered company into a customer centric company, where information flows and is shared with all relevant roles in the organization.

Sharing data, instead of owning data, is a big game changer. It requires companies to work different. In the past when you did not need to share data, you could store it anywhere and in any way you prefer to do this. It was your duty and job security to control the data. Now when an experienced person retires or leaves the company, we struggle to get this information back (or we lose it and recreate it later when needed again). Search engines become popular technology to find back data – if possible! I believe Search engines can help to connect the past to the future infrastructure, but there is more.

cloudSharing data does not mean storing data in the cloud. The cloud makes it easier to share data as the company can focus more on the business side of the solution instead of the IT-side where and how to store it at what cost. It is the awareness of the content (“Do I search for something that exists”) and the quality (“Can I trust what I have found”) that we share that needs to get the focus.

For data sharing a disruptive change is needed, which does not happen in the classical PLM environments. There we think too much in departments and a sequential (or concurrent) way of working.

Aiming for sharing is disruptive. The fact that engineers need to provide more accurate data is seen as a productivity loss instead of a gain through the whole organization – see an old post: “Where is my PLM ROI “?. Organizations normally do not like disruptions. Individuals do. If they find a cheaper and easier way to get their work done, they will grab this opportunity and not do anything more. However companies have the tendency and need to keep things more complex as it is not a single task the focus on. It is a complex network of interactions.

I had the chance to read two interesting topics in this context recently. First a relative new blog related to disruptive innovation: the Off-White papers. Although it is not about PLM, it describes the challenges related to disruptive innovation, and if you have a twisted PLM-brain you will get the message.

ProfitBeyondMeasureThe same for a book I have been reading from H. Thomas Johnson called Profit Beyond Measure . Johnson describes in his book, based on cases from Toyota and Scania, a different business model focused on customer delivery instead of internal departmental optimization. Again my twisted PLM-brain got triggered by the customer centric business model. A favorite quote:

A continuously linked and balanced organization that “works to customer order” reflects a very different management style (and organization JV) than does a decoupled and discontinuous organization that “works to schedule”

It is the difference between managing by results (MBR) and managing by means (MBM). And I believe this is the target of modern PLM too.

Conclusion

Even with some small statistics I hope it is clear that PLM is not a simple activity as there are many constraints that can influence a project. Having an understanding about these constraints and being able to remove the blocking constraints is what I believe is the job of a PLM consultant.

Do you agree? Is there an easier world? I am looking forward to your feedback through the comments or through a response in the small survey: PLM, your opinion

Translate

Categories

  1. As a complement, even if more and more of the diversity of a product is managed at the software level…

  2. 1) A wiring diagram stores information (wires between ports of the electrical components) that does not exist in most of…

  3. BOM has NEVER been the sole "master" of the Product. The DEFINITION FILE is ! For example the wiring of…

%d bloggers like this: