observation The last month I have been working with Aerosud Aviation in South Africa to finalize and conclude on ROI and the lessons learned around their PLM implementation, which started in May 2007.  I was lucky to be involved in the initial scoping of the project in 2007 and assisted the local Value Added Reseller together with the team from  Dassault Systèmes UK team in a step by step project towards PLM.

planningWhen I met the people in Aerosud the first time in 2007, I noticed it was a young company, with open-minded people, everyone trying to improve their daily activities per department. There was the need for PLM as some of their major customers required Aerosud to have a PLM system in place. Also Configuration Management was mentioned many times in the interviews and what I learned that time: Excel was the tool for configuration management.

Based on the initial interviews a plan needed to be developed in which steps to implement PLM.  The following three major points were the guidance for the implementation:

  1. The company was thinking documents and understanding documents especially Excel
  2. The company had no clear understanding of what PLM would mean for them as real awareness was not inside the company. Customers like Boeing and Airbus talked about the importance of PLM, but how this could impact Aerosud as a company was no commonly clear
  3. People in the company had a major focus on their department and there was no availability of a overarching group of people leading the implementation

You could say you will see the above points in many smaller and medium-sized companies. I wrote about it also in one of my previous posts: Where does PLM start beyond document management ?

The project phases

riaan The good news for Aerosud was that their PLM Champion was an expert in CATIA and was familiar with writing macros in Visual Basic plus the fact that everyone in the company was open for using the system as standard as possible – no demands for special behavior of the system:  “because we do this already for 100 years”

The last phrase you hear a lot in ancient Europe

The choice was to start with implementing ENOVIA SmarTeam Design Express and to focus in two phases around design data management (phase 1) and the usage of design data by other users (phase 2)

The plan was that each phase would take maximum 2-3 months and we would give the users the time to digest and change their habits towards the standards in the system. In reality it took almost a year, not due to technical or conceptual issues, but this was the maximum pace we could have with the amount of time and available resources. The good news after these two phases was that the first bullet was much clearer understood – the difference between having a system with a single version of the truth or Excel management.

businesssystem In the summer of 2008 (our summer – as it was winter in South Africa) there was a management workshop in Aerosud and here after three days of discussion the position of PLM became clear. One year ago this would not have been possible, now people had seen ENOVIA SmarTeam and they could imagine what benefits the system could further bring. This addressed the second bullet I mentioned before. Although this workshop was not scheduled upfront, looking back now I see this was a crucial point to get understanding for the next PLM steps.

 

The next PLM steps were extending to a real Item-centric data model, because if you want to do PLM you need to work around Bill of Materials and all related information to the items in the Bill of Material. At the end this gives you configuration management without chasing Excels.

Again the next steps were divided in two phases with again a scope of 2 – 3 months. The implementation would be based on the ENOVIA SmarTeam Engineering Express methodology which came as a logic extension of the current implementation, without having to change the database or existing data model.

In the first phase we had awareness sessions for BOM (discussing EBOM / MBOM / Effectivity, etc) plus in parallel we introduced the item as place holder for the information. Not longer folders or projects as the base.

Introduction of the item was conceptual not a big issue and the major activities in this phase were focused on connection legacy data or current data from projects to the items. Data coming from various sources (directories, legacy databases) plus NC data became connected and visible in the single version of truth.

In the second phase of moving to PLM the focus was on EBOM and MBOM. Initially assuring that from the designer point of view the CATIA design and EBOM were connected as smoothly as possible, trying to avoid a lot of administrative overhead on the designer (sometimes unavoidable – see my previous post: Where is my ROI, Mr. Voskuil)

ebom_mbom

After having implemented a streamlined CATIA – EBOM connection, the focus moved to the MBOM. For me this is the differentiator for companies if they implement PLM or just Product Data Management). Implementing the MBOM requires a culture change and this is the place where the ERP people need to see the benefits instead of the threats . Luckily in Aerosud the manufacturing engineers were working in their Excels initially and not in the ERP system – which happens a lot in older companies.

For that reason the concept of MBOM in PLM was much better understood. Now Aerosud is experiencing these capabilities and once they become obvious for everyone the third bullet will be addressed: people start to work in processes cross-departmental instead of optimizing their department with a specific tool.

phased implementation As this activity will continue, I also conducted with the Aerosud management and PLM implementation team an ROI assessment. Estimates about the experienced and projected benefits were kept low and on the realistic side. The result was that the outcome for the ROI period was approx 27 months, almost the same time as the whole project had as throughput time. This proved again the statement about a phased PLM approach. payback of project comes in parallel with the implementation and will ultimately fund the next steps.

 

 

shout_left End of July I will be holding a webinar with more details about this implementation for the Dassault VAR Community. I will be happy to expand this information for a wider audience afterwards, as I believe the project is representative for many mid-market companies that struggle to find the place where PLM fits ….. and brings ROI

 